Client: TRU West

Type: Rail

Location: Huddersfield

Status: Live

Service: Modular Accommodation

  • 100 unit modular accommodation to provide facilities for 750 staff and site workers

100

Modular bays

5

Storey modular building

750

Office and site workers utilising the facility

Case Study

As part of the expansive Transpennine Rail Upgrade between Leeds and Manchester, Select Modular delivered a significant contribution with the completion of one of its largest modular buildings to date. This milestone project involved the delivery and installation of over 350 modular units, emphasising Select’s capacity to undertake large-scale, innovative construction projects. The modular building stands as a testament to Select’s commitment to modern, inclusive, and well-being-focused design principles.

Project Development Phases
The construction was completed in three key stages to ensure precision and adherence to project requirements:

  • Stage 1: Design and Manufacturing
    The project was designed and manufactured at Select’s advanced facility in Wincham. The building was engineered to meet rigorous standards, including full JCOP 10.2 compliance, and incorporated specialised wind-loading design to ensure long-term stability.

  • Stage 2: Modular Installation and Assembly
    The modular units were efficiently transported and assembled on-site, showcasing Select’s expertise in rapid deployment. The installation process was streamlined to minimise disruption while maintaining stringent safety standards.

  • Stage 3: Fit Out and Commissioning
    After assembly, the building underwent a comprehensive fit-out and commissioning phase to guarantee functionality and compliance with all relevant building codes. This ensured the facility was operationally ready and tailored to meet the needs of the workforce.

Key Features and Benefits

  • Accessibility and Compliance
    The building is fully DDA compliant, featuring step-free access on the ground floor, an accessible lift to the upper levels, and fully equipped accessible toilet and shower facilities. These elements underscore Select’s dedication to inclusivity and equal access for all staff members.

  • Safety and Mobility
    The inclusion of an internal stairway was strategically designed for safe and efficient movement within the building, meeting both functional and safety standards.

  • Well-Equipped Workspaces
    The modular building integrates a dedicated briefing area, essential for team meetings and strategic discussions. Additionally, comprehensive welfare facilities, including kitchen spaces and rest areas, provide essential support for staff health and comfort.

  • Wellbeing Suite
    A standout feature of the project is the well-being suite—a dedicated space to support the mental and physical health of employees. This area reflects Select’s forward-thinking approach to workplace design, prioritizing staff welfare.

  • Unique Viewing Gallery
    The building also boasts a viewing gallery that overlooks the Huddersfield Rail Platforms, offering staff a unique perspective of the site. This feature not only enhances the workspace with a touch of relaxation but also serves as a reminder of the broader context of their work within the Transpennine Rail Upgrade.

01/10/24

Transpennine Route Upgrade 100-cabin HD1 Compound at Huddersfield Station