Client: Everton Stadium Development Ltd

Type: Sporting Arena

Location: Liverpool

Status: Live

Service: Modular Accommodation

  • 80 unit modular accommodation to provide facilities for 550 staff and site workers
  • 52,888 seater stadium

Case Study

Select manufacturing and installing a new 80-bay modular building at Bramley-Moore Dock for the Everton Stadium project.  

A four-storey facility, visible from Regent Road, was designed and manufactured by Select’s facility in Wincham, Cheshire just over 30 miles from site, and installed by the Select’s specialist lifting team. The Select team assembled the units on-site in just nine days and handed them over in record time, only four weeks after arriving on site.

The modular building has improved insulation, higher thermal performance windows, smart energy sensors and LED lighting. Utilising air-source heat pumps to recover excess heat from the drying room and use it to heat water for the onsite showers – all of which means the modular building has an energy performance certified A rating.

The team of 550 people at Bramley-Moore Dock will move into more spacious and lighter modular that form the new, open-plan project offices, and kitchen areas – allowing people to bring and prepare their own food, changing rooms, toilets, canteen and a dedicated contemplation and wellbeing space. The block also contains a passenger lift, additional heating and drying facilities and a top-floor gallery with panoramic views across the site onto the River Mersey.

Click here to see the modular accommodation for yourself!

Select is also providing plant equipment for the project, including the four tower cranes that have been used to construct the structural frame, together with several crawler cranes. 

80

Modular bays

4

Storey modular building

550

Office and site workers utilising the facility