Logo image Go to homepage
  • Accreditations
  • Why choose us
  • Leadership team
  • Locations
  • 01322 732732
  • Select UK LinkedIn
  • Services

    Services

    Select is one of the UK's largest and most capable suppliers of equipment and services to the construction industry.

    Our Services Services
    • Engineering surveying & monitoring
    • Lifting solutions
    • Logistics solutions
    • Modular Buildings
    • Piling & pumping
    • Power Solutions
    • Sustainability
    • Training academy
    • Test & inspection
    • Vertical distribution & access
  • Projects
  • Product Catalogue
  • News
  • Contact Us
  • Careers
  • Accreditations
  • Why choose us
  • Leadership team
  • Locations
  • 01322 732732
  • Select UK LinkedIn
Decorative image.
  • Homepage
  • About us
  • Sustainability timeline

Sustainability timeline

Our roadmap to net zero has been devised to look at past innovations that have helped support the business's evolution over the years and gives foresight into the future of our sustainable journey.

2023 - 2050

Sustainability
Card image.

2023 - Gold Supply Chain Sustainability School

For the second year in a row and with full marks achieved in all categories, Select has been awarded gold status for the Supply Chain Sustainability School’s Plant Charter Commitment.

Sustainability
Card image.

2023 - Sustainability Configurator Launch

The tool will be launched with the aim of helping clients choose a low carbon modular set up in the early design phase to meet their carbon targets.

Card image.

2023 - Electric Vans

Having successfully trialled electric vans on the Manchester Metro project, Select has introduced five Peugeot e-Expert Professional panel vans to its fleet. The e-Experts vans are being used by Select to cover a range of journeys with different payloads and distances to fully test the new vehicles’ capabilities.

Modular Buildings
Card image.

2024 - Modular Buildings Submetering

Enable local energy monitoring and analysis at all temporary construction site set ups.

Sustainability
Card image.

2024 - Sign up to Science Based Targets Initiatives (SBTIs)

Setting interim ‘science-based’ targets enroute to net zero, they are in line with what the latest climate science deems necessary, to meet the goals of the Paris Agreement – limiting global warming to 1.5°C above pre-industrial levels.

Card image.

2025 - Depots Diesel Free

Aim for our Littlebrook depot to be diesel free (including HVO use) for direct operations prior to 2025.

Card image.

2030 - Scope 1-3 Reductions

42% reduction in Scope 1 & 2 emissions (fuel and electricity) and 25% reduction in Scope 3 (purchased goods and services) by 2030

Card image.

2033 - 50/50 Gender Split

To ensure the number of men and women employed in its international staff (currently 5,500 people) are equal by 2033, with additional gender-focused initiatives to be set out to improve representation among frontline construction workers.

Card image.

2050 - Net Zero

Accelerate progress in reducing Scope 1-3 emissions to achieve a 90% reduction.

2021 - 2022

Dumarey Flybrid
Card image.

2021 - Flybrid

The innovative flywheel energy storage system set to save over 80 tonnes of CO2 being released into the atmosphere and over 30,000 litres of fuel every 3,000 hours.

Lifting solutions
Card image.

2021 - Telematics Tower Cranes

Enables monitoring of power consumptions, utilisation, idling and CO2. Data derived from the tool is enabling us to drive further efficiencies within our operations and supporting more sustainable behaviours.

Card image.

2021 - HSBC Green Funding

Committed to investing in the latest sustainable plant innovations and taking repeated “leaps of faith”, to maintain the leading role in transforming the construction industry.

Card image.

2021 - Rego Green Power

All electricity purchased by the business in powering our operations is from Renewable Energy Guarantees of Origin (REGO).

Piling & pumping
Card image.

2022 - Battery Powered Drilling Rig

Select became the first company in the world to take delivery of the LB30 unplugged. Producing zero emissions, it has the same performance as its diesel-powered counterparts.

Card image.

2022 - Knowledge Transfer Programme

Collaboration with John Moore University Liverpool to improve drying rooms.

Card image.

2022 - Gold Supply Chain Sustainability School

Those who sign up to the Charter commit to reduce greenhouse gas (GHG) emissions, and to improve air quality through the use of more sustainable construction plant and equipment.

Vertical distribution & access
Card image.

2022 - MEWPs and Active Telematics award

London Construction Awards ceremony saw Select take home the ‘Technological Innovation of the Year’ award, for its Mobile Elevating Work Platforms (MEWP) Telematics system.

Test & inspection
Card image.

2022 - Test & Inspection Receive LEEA Award

Awarded Best Digital Innovation 2022 for the the roll-out of our digital LOLER & PUWER Asset Management and Certification System.

2008 - 2020

Card image.

2008 - CEMARS

Established our carbon baseline and signed up for the Carbon & Energy Management and Reduction Scheme.

Card image.

2015 - UN 17 Sustainable Development Goals

Paris Agreement global Net-Zero target of limiting global warming to 1.5°C.

Card image.

2018 - Electric Vans

EV used throughout the Manchester Metro project.

Card image.

2019 - Electric Pump

Our Schwing electric concrete pumps offer enhanced life expectancy, reduced maintenance costs, greater utilisation through operating with electric power units as opposed to diesel. The zero emission operation provides equal power and performance on par with the diesel driven counterparts.

Card image.

2020 - Hydrotreated Vegetable Oil

Trials commenced for the transition from red diesel to HVO. This will reduce GHG emissions from the operation of plan by up to 90%.

Card image.

2020 - Electric Cars

EV and Hybrid car fleet saves 2941 tonnes of CO2e per annum.

LR1250.1 unplugged
Card image.

2020 - Battery Powered Crawler Cranes

The first business in the UK, and second in the world, to take delivery of the LR1250.1.

Card image.

2021 - Platinum Status

After 12 years of reporting Greenhouse Gas emissions, (GHG) within the Carbon Reduce programme, (formally CEMARS) and reducing our Scope 1 & 2 direct carbon emissions by 72.6% since the 2008/09.

Copyright © Select 2024
  • Terms and Conditions
  • Modern Slavery
  • Cookies Policy
  • Privacy Policy
  • Cookie Settings
Copyright © Select 2024
  • linkedin
  • instagram